LumenProcess Manager

Free tool · Six Sigma

Sigma & Control Chart

Turn defects into a sigma level, combine on time, undamaged and complete into one perfect delivery number, and see on a control chart whether a bad day is a signal or just noise.

1 · Calculator

How good is the process?

Type the numbers from any period. Everything updates as you type, and nothing leaves your browser.

From defects to sigma

Chances per unit: how many ways one unit can fail that you count separately. Keep it at 1 when you count damaged or incomplete units.

Perfect delivery

A delivery is perfect only when it is on time, undamaged and complete. Take the numbers from Delay Analyzer, Damage Control and Incomplete Control. Multiplying them assumes the three failures are independent, so read the result as a close estimate.

What a sigma level means

Sigma levelDefects per millionYieldFailures per 1,000

Short-term sigma, with the 1.5 shift that sigma tables add by convention (it assumes a process drifts over time; it is a convention, not a measurement). Most warehouse and delivery processes run between 3 and 4.5 sigma; every step up means roughly three to ten times fewer failures.

2 · Control chart

What you are counting
Add a day

Paste from Excel or CSV

One row per day, columns in this order: date, handled, defects, note. Tabs, semicolons or commas all work, and a header row is skipped. A date that is already in the chart is replaced.

Mark a change on the timeline optional

A new standard, a new layout, a new team: mark the day it started, and the charts show a line there, so you can see whether the numbers moved after it.

Days

No days yet. Add them above, paste from Excel, or .

From the essays

Read the story behind this tool

The guide · Edition 8 · Page 53

How to use this tool, in the guide

Why each tool exists, which family it belongs to and how to use it step by step, in one book you can leaf through.

Feedback

Did this tool help you?

Your work

All your work in one file

Every tool keeps your work only in this browser. Save it as one file to keep a copy, to carry on from another phone or computer, or to hand it to a colleague. Nothing is uploaded.

The file holds the tools' photos too, up to 20 MB of them; restore points stay on this device.

Team sync Off

Share the tools you choose with your team: every device keeps working without a connection and syncs when it can. The work is encrypted on this device with a key made from the team code, so the server cannot read it.

Shared computer

The tools are locked

Enter the PIN to open your work on this device.

Forgot the PIN?

The PIN is kept nowhere, so the locked work cannot be opened without it. You can start again on this device: the locked work, the restore points and the reminders are removed. A saved file is not touched.

All your work in one file

Process Manager

More from Lumen

Open the planet: routine, learning, next orbit