Free tool · Warehouse

Damage Control

Log every damaged unit with the stage where it was found and the cause behind it. The tool shows your damage rate, the few causes behind most of it, and where in the process to start.

1 · Period
2 · Log a damage

Paste from Excel or CSV

One row per damage, columns in this order: date, shift, stage, damage type, cause, units, cost, note. Tabs, semicolons or commas all work, and a header row is skipped. Your own stage or cause names are kept as they are.

3 · Log

No damage logged yet. Add the first one above, paste from Excel, or .

Floor check

Does the standard hold?

Walk the dock and tick what you actually see today, not what the SOP says. Every unticked line is a place where damage can start.