Heijunka

Level the mix of a line, a pick area or a packing station the way Rother and Shook and Art Smalley describe it. Enter the time the line has and what each product needs, and see the takt, the pitch, the load and the EPEI, the day's sequence in a heijunka box with clock times, and what levelling costs in changeovers and saves in finished stock and in uneven hours. The box prints on A4 for the line.

1 · The line and its time

Available time per day = shifts × (shift length − planned breaks). The batch interval is how often each product runs in today's schedule: 5 means once a week.

2 · Products and families

Demand for the same period as the working days. Cycle time per unit at this line, in seconds; the pack-out is the units in one container (a tote, a case, a pallet); the changeover is the time to change over to this product. To shorten it, use SMED Changeover.

Product or familyDemand in the periodCycle time (s)Pack-out (units)Changeover to it (min)Per day · pitchRemove

No products yet. Add the products or families the line makes, or .

The guide · Edition 7 · Page 70

How to use this tool, in the guide

Why each tool exists, which family it belongs to and how to use it step by step, in one book you can leaf through.

Feedback

Did this tool help you?

Your work

All your work in one file

Every tool keeps your work only in this browser. Save it as one file to keep a copy, to carry on from another phone or computer, or to hand it to a colleague. Nothing is uploaded.

Team sync Off

Share the tools you choose with your team: every device keeps working without a connection and syncs when it can. The work is encrypted on this device with a key made from the team code, so the server cannot read it.

Process Manager

More from Lumen

Open the planet: routine, learning, next orbit