LumenProcess Manager

Free tool · Lean

Time Study

Stand at the line with a stopwatch and time the work element by element, cycle after cycle. The tool gives you the standard time of each element, the takt from demand and available time, a Yamazumi of every station against that takt, how much of the time is waste, and which element to move first.

1 · Process and takt

Available time is the shift minus breaks, meetings and planned stops. Takt is that time divided by the demand: the customer's clock.

2 · Stations and elements

One to eight stations in the order of the flow. Under each, the elements of its work in the order they happen, each marked VA (value-added), NVA (necessary) or W (waste).

3 · Stopwatch

Space is the lap key. Each lap closes the element being watched and opens the next; after the last element the next cycle begins. Time at least three cycles per station, five is better.

Type or paste timings

Or paste rows from Excel, columns in this order: station, element, cycle, seconds. Tabs, semicolons or commas all work, and a header row is skipped. A station or element may be its name or its number.

4 · Timings

No timings yet. Start the stopwatch, type them in, or .

The guide · Edition 3 · Page 40

How to use this tool, in the guide

Why each tool exists, which family it belongs to and how to use it step by step, in one book you can leaf through.

Feedback

Did this tool help you?

Your work

All your work in one file

Every tool keeps your work only in this browser. Save it as one file to keep a copy, to carry on from another phone or computer, or to hand it to a colleague. Nothing is uploaded.