8D Report

For the problem a customer saw: the eight disciplines of the Global 8D, from the first emergency response to the closing of the team's work. Contain within a day, find why it happened and why nobody caught it, prove the fix with data, and change the systems so it does not come back. Every discipline has its status and its date, and the days count against your target times.

Your 8D reports

    No 8D report saved yet. Start a new one below, or .

    Target times Calendar days from the opening date

    The defaults are common practice in automotive and logistics quality: containment within 24 hours (D3 by the next day), the root cause within 10 days, the corrective actions within 14, implemented within 30, the report closed within 60. Use your customer's rules where they differ.

    The report
    D0 · Prepare and emergency response
    D0 · Prepare and emergency response

    Does this problem need an 8D, and what protects the customer right now, before anyone knows the cause?

    Is an 8D needed? Tick what applies:

    D1 · Establish the team
    D1 · Establish the team

    Who knows the product and the process, who leads the team, and who as champion removes the obstacles?

    D2 · Describe the problem
    D2 · Describe the problem

    What is wrong with what, in numbers? Answer 5W2H, set IS against IS NOT, then write one problem statement. No causes yet.

    5W2H

    IS / IS NOT

    What

    Where

    When

    Extent

    D3 · Interim containment actions
    D3 · Interim containment actions

    How do you stop the next bad delivery while the cause is still unknown? Sort every place the suspect stock can be, and prove that the containment works.

    D4 · Root cause and escape point
    D4 · Root cause and escape point

    Why did it happen, and why did nobody catch it? Two root causes, each verified: you can turn the problem on and off with it.

    Root cause of occurrence

    Root cause of non-detection (escape point)

    Open 5 Whys Open Fishbone

    D5 · Permanent corrective actions
    D5 · Permanent corrective actions

    Which actions remove both root causes? Choose them, and verify that they work before you implement them.

    D6 · Implement and validate
    D6 · Implement and validate

    Put the actions in place, show with data that the problem is gone, and only then remove the containment.

    Validation: the defect rate before and after

    D7 · Prevent recurrence
    D7 · Prevent recurrence

    Which systems change so that this cannot happen again, here or anywhere similar?

    • Update the FMEA. Add the failure mode and its cause, then re-rate occurrence and detection.
    • Update the control plan. The new check: what, how often, by whom, and what to do when it fails.
    • Update standard work. Change the instruction at the workplace, so the new way is the only way.
    • Train the people. Everyone who does the work, on every shift, with a sign-off.
    • Read across to similar products and processes. Where else can the same cause sit: other sites, lines, zones, products?
    D8 · Recognise the team and close
    D8 · Recognise the team and close

    Thank the team for what it did, write down what you learned, and close the report.

    Saved in this browser.

    The guide · Edition 5 · Page 61

    How to use this tool, in the guide

    Why each tool exists, which family it belongs to and how to use it step by step, in one book you can leaf through.

    Feedback

    Did this tool help you?

    Your work

    All your work in one file

    Every tool keeps your work only in this browser. Save it as one file to keep a copy, to carry on from another phone or computer, or to hand it to a colleague. Nothing is uploaded.