Planet Zenith · One area, week by week

Area Manager

You lead the shift leads. You read an area's numbers week by week and decide where the next hour of attention goes.

Coaching workspace

Turn an area review into follow-through.

Saved in this browser. No account or team sync. Export a backup to keep your work or move it to another device.

Use

The tools of this orbit

Last mileWeekly

Last-Mile CX Control Tower

Perfect Delivery per order, on time, incomplete, damage, cold chain, loading and departures, partner and driver scorecards, route risk, root-cause Pareto, actions and a weekly review. A deep dive on one failure: where it concentrates, the evidence rows and an investigation that becomes a verified action. Reads your Excel workbook.

Open the control tower
Diagnostic2 min

KPI Diagnostic

A number turned red. Ten statements show which cause your answers point to, clarity, skill, capacity, process design or ownership, as a hypothesis to check on the floor, with first moves.

Start the diagnostic
Root causes5 min

Pareto 80/20

Which few causes make most of your delays, errors, idle time or complaints? Templates for delivery, warehouse and hotel, CSV and Excel import, a checked chart.

Find the vital few
Problem solving20 min

A3 Report

One problem on one sheet, the Toyota way: the facts and the number, the target and its date, the root cause, countermeasures with an owner each, and the follow-up. An eight-point check, print on A3 or A4, Word.

Start an A3
ImprovementWeekly

Kaizen Board

Every improvement idea of the team on one board, from Idea through Plan, Do and Check to Adopted, with an effort and impact matrix that shows the quick wins. Adoption rate, days to adopted, savings per month and year, and the idea of the month.

Open the board
People15 min

Skills Matrix

Rate each person on each task from 0 to 4 in an ILU grid, with templates for warehouse, hotel front office and delivery station. Cover against target, single points of failure, cover per shift and a training plan that pairs a level 4 with a trainee, straight into actions.

Build the matrix
EquipmentOngoing

OEE

Log each shift of a machine with its stops, pieces and rejects. Availability, performance, quality and OEE, the six big losses day by day, and the one to attack first.

Measure OEE
HotelOngoing

Hotel KPIs

Each night's rooms sold, revenue, no-shows, rooms out of order and complaints, pasted from the PMS. Occupancy, ADR and RevPAR against budget, the month's forecast, the weekday pattern, the revenue that leaked and a morning report to copy.

Open the KPIs
Lean15 min

Gemba Walk

Layered process audits by team lead, area manager and site lead, with yes or no checks on the standard for warehouse, hotel and delivery station, and a waste walk that counts the 8 wastes, Mura and Muri. Compliance per week and layer, where the no answers sit, which layer is late, and findings straight into actions.

Start the walk
Report5 min

Operations Report

The weekly or monthly report for your manager, written from the data of the other tools: safety, quality, delivery, OEE, 5S, hotel, Kaizen and actions, each against the period before and its target. What got better, what got worse, the biggest risk, one decision and three priorities. Text, A4 or Word.

Write the report
Hotel5 min

Room Inspection

Check a cleaned room before it is released: pass, fail or n.a. by zone, critical items that fail the room on their own, a photo of the fault. Re-cleans go back to the attendant, maintenance to the Action Tracker; the first-time pass rate per attendant, floor and room type shows where to coach.

Inspect a room
EquipmentWeekly

Maintenance Planner

Plan the preventive maintenance and statutory checks of every asset by date or operating hours, log what was done, postponed or broke down, and see what is overdue, the PM compliance, MTBF and MTTR, and the work list of the week.

Plan maintenance
Overview2 min

Signals

Every tool in this browser read in one ranked morning list: control chart signals (p, c, u and I-MR with the run and trend rules), missed targets, overdue actions, maintenance, red tags and ideas, and safety on top.

Read the signals
Hotel10 min

Housekeeping Planner

The executive housekeeper's staffing plan: departures, stay-overs, linen changes, VIP rooms, deep cleans and public areas become workload minutes (or credits) and the attendants needed against those scheduled, with hours, labour cost and minutes per occupied room. Sections balanced by minutes on as few floors as possible, printed per attendant or set into Room Status, and the week from the forecast.

Plan the housekeeping team
LeanDaily

Leader Standard Work

Each leader's routine as a standard, from the team leader's huddle to the site manager's Gemba walk, checked off every day: done, or missed with a reason. The next level up reviews the adherence each week, sees the share of the day in standard work against the guide for the level, and sends a task missed three times in two weeks to the Action Tracker.

Write the standard
Planning10 min

Shift Capacity

Turn the volume forecast and the rate of each process into the heads every shift needs, with breaks, utilisation and absence, and see the gap against the planned team, the bottleneck and how to close it with overtime, agency or qualified people from another process.

Plan the shifts
SafetyPer area

Risk Assessment

The documented risk assessment of each work area: hazards from the eleven hazard-factor groups, likelihood × severity on a 5 × 5 matrix, measures in the STOP order with owners and their effectiveness check, the residual risk and the review date, set against the events of the Safety Cross.

Assess the risks
SustainabilityWeekly

Energy & Water

Meter readings for electricity, gas, water, district heat or oil turned into use, cost and CO₂ for any period, kWh per occupied room night or per order, each meter against its own baseline, and a signal when a week drifts above it.

Read the meters

Borrowed from other orbits

Routine

When each tool earns its place

  1. Every morning

    Read yesterday in one view: on time, undamaged, complete and complaints.

    Last-Mile CX Control Tower
  2. When a KPI turns red

    Find out whether it is clarity, skill, capacity, process or ownership before you push.

    KPI Diagnostic
  3. Every week

    Sort the week's losses and start with the few causes behind most of them.

    Pareto 80/20
  4. Every week

    Read the logs of your shifts week by week: rates, the trend and what is still open.

    Shift Pulse
  5. Every week

    Check with your shift leads where route delays begin.

    Delay Analyzer
  6. Every month

    Tell a real change from a normal bad day before you react.

    Sigma & Control Chart
  7. When a problem returns

    Write the problem on one A3 before you fix it: the number, the root cause, one owner per countermeasure, and the date you will check.

    A3 Report
  8. Every week

    Answer every new idea within the week, move each card one honest step, and name the idea of the month in front of the team.

    Kaizen Board
  9. Every month

    Walk the matrix with each team lead, update the levels you saw on the floor, take a snapshot and give every single point of failure a trainee and a date.

    Skills Matrix
  10. End of shift

    Log the shift of each machine with its stops by reason, then attack the biggest of the six losses with an owner and a date.

    OEE
  11. Every morning

    Paste last night's figures from the night audit, read the morning report at the meeting and act on the KPI the tool puts first.

    Hotel KPIs
  12. During the shift

    Walk your layer's questions where the work is done, answer each with yes or no against the standard, and give every no you cannot fix on the spot an owner before you leave the floor.

    Gemba Walk
  13. Every week

    Send last week's report to your manager and put its three priorities into the Action Tracker.

    Operations Report
  14. During the shift

    Inspect every checkout and VIP room before release, and coach on the fault that fails most.

    Room Inspection
  15. Every week

    Print the work list on Monday and give every overdue task on a critical asset a date this week.

    Maintenance Planner
  16. Every morning

    Read the signals before the morning meeting, take the first high ones to the floor and give each one an owner, a 5 Whys or a date.

    Signals
  17. Every morning

    Read today's departures and stay-overs after the night audit, check the attendants needed against the schedule, and hand every attendant the printed sheet of their section.

    Housekeeping Planner
  18. Start of shift

    Open today's standard, tick each task as you do it, and give every miss a reason before the handover.

    Leader Standard Work
  19. Every week

    Paste next week's volume forecast before the roster closes and close every shift that is short of hours with a move, overtime or agency booking.

    Shift Capacity
  20. Every month

    Walk one area with the people who work there, close or re-date its overdue measures and check the effect of the ones done.

    Risk Assessment
  21. Every week

    Read the meters on Monday morning, type them in, and send any meter that drifts above its baseline to the Action Tracker as a check.

    Energy & Water

Grow

The next orbit