Free tool · Hotel
Room Inspection
Check a cleaned room before reception sells it: every item of the checklist pass, fail or n.a., zone by zone, with a note and a photo where it fails. The room gets a score and a verdict, each fault goes back to the attendant or to maintenance, and the log shows the first-time pass rate per attendant, floor and room type, and the items that fail most.
1 · Rooms, team and checklists
A room passes at the pass mark or above, and only when no critical item failed.
Own checklists
Copy the chosen checklist to change its items. The weight is 1 to 3; C marks a critical item, which fails the room on its own.
3 · Inspection log
| Date | Room | Room attendant | Inspector | Type | Score | Result | Remove |
|---|
No inspections yet. Inspect a room above and save it, or .
The guide · Edition 4 · Page 35
How t o use this t ool, in the guide
Why each tool exists, which family it belongs to and how to use it step by step, in one book you can leaf through.
Feedback
Did this t ool help you?
Your work
All your work in one file
Every tool keeps your work only in this browser. Save it as one file to keep a copy, to carry on from another phone or computer, or to hand it to a colleague. Nothing is uploaded.
Then clear old entries in these tools to make room: the file keeps them, and opens on any device.
Works offline too: once a tool has been opened on this device, it and the other tools of its role open without a connection.
Team sync Off
Share the tools you choose with your team: every device keeps working without a connection and syncs when it can. The work is encrypted on this device with a key made from the team code, so the server cannot read it.
Your team code
On another device, open this box and scan the code or type the six words under “Join a team”. Give it only to your team: whoever has it can read and change the shared work. Write it down; it is not shown again.
The team changed the work of this tool. Reload the page to see it.
- Last mile · WeeklyLast-Mile CX Control
T owerPerfect Delivery per order, on time, incomplete, damage, cold chain, loading and departures, partner and driver scorecards, route risk, root-cause Pareto, actions and a weekly review. A deep dive on one failure: where it concentrates, the evidence rows and an investigation that becomes a verified action. Reads your Excel workbook.→ - Diagnostic · 2 minKPI DiagnosticA number turned red. Ten statements show whether the cause is clarity, skill, capacity, process design or ownership, with first moves for each.→
- Root causes · 5 minPar
e t o 80/20Which few causes make most of your delays, errors, idle time or complaints? Templates for delivery, warehouse and hotel, CSV and Excel import, a checked chart.→ - Problem solving · 20 minA3 Repo
r tOne problem on one sheet, the Toyota way: the facts and the number, the target and its date, the root cause, countermeasures with an owner each, and the follow-up. An eight-point check, print on A3 or A4, Word.→ - Improvement · WeeklyKaizen BoardEvery improvement idea of the team on one board, from Idea through Plan, Do and Check to Adopted, with an effort and impact matrix that shows the quick wins. Adoption rate, days to adopted, savings per month and year, and the idea of the month.→
- People · 15 minSkills MatrixRate each person on each task from 0 to 4 in an ILU grid, with templates for warehouse, hotel front office and delivery station. Cover against target, single points of failure, cover per shift and a training plan that pairs a level 4 with a trainee, straight into actions.→
- Equipment · OngoingOEELog each shift of a machine with its stops, pieces and rejects. Availability, performance, quality and OEE, the six big losses day by day, and the one to attack first.→
- Hotel · OngoingHotel KPIsEach night's rooms sold, revenue, no-shows, rooms out of order and complaints, pasted from the PMS. Occupancy, ADR and RevPAR against budget, the month's forecast, the weekday pattern, the revenue that leaked and a morning report to copy.→
- Lean · 15 minGemba WalkLayered process audits by team lead, area manager and site lead, with yes or no checks on the standard for warehouse, hotel and delivery station, and a waste walk that counts the 8 wastes, Mura and Muri. Compliance per week and layer, where the no answers sit, which layer is late, and findings straight into actions.→
- Report · 5 minOperations Repo
r tThe weekly or monthly report for your manager, written from the data of the other tools: safety, quality, delivery, OEE, 5S, hotel, Kaizen and actions, each against the period before and its target. What got better, what got worse, the biggest risk, one decision and three priorities. Text, A4 or Word.→ - Equipment · WeeklyMaintenance PlannerPlan the preventive maintenance and statutory checks of every asset by date or operating hours, log what was done, postponed or broke down, and see what is overdue, the PM compliance, MTBF and MTTR, and the work list of the week.→
