ZenithArea Manager

Free tool · Equipment

OEE

Log each shift of a machine: the planned time, the stops with their reasons, the pieces made and the rejects. The tool shows availability, performance, quality and OEE, splits the lost time into the six big losses, and says which one to attack first.

1 · Equipment

Each machine with its ideal rate: the pieces per hour it makes at full speed, from the machine plate or the supplier. The ideal cycle in seconds works too.

No machine yet. Add the first one above.

2 · Log a shift

Tap a reason to add it, then type its minutes. Planned stops (breaks, meetings, no orders) are taken out of the planned time.

Breakdowns
Setup and adjustments
Small stops
Reduced speed
Planned stops

Paste from Excel or CSV

One row per machine and shift, columns in this order: date, shift, equipment, planned minutes, stops, pieces, rejects, startup rejects, note. Tabs, semicolons or commas all work, and a header row is skipped. The stops as reason: minutes, separated by commas or semicolons; a machine that is not in the list is added without a rate.

3 · Period
Show results for

4 · Log

No shifts logged yet. Add the first one above, paste from Excel, or .

The guide · Edition 3 · Page 30

How to use this tool, in the guide

Why each tool exists, which family it belongs to and how to use it step by step, in one book you can leaf through.

Feedback

Did this tool help you?

Your work

All your work in one file

Every tool keeps your work only in this browser. Save it as one file to keep a copy, to carry on from another phone or computer, or to hand it to a colleague. Nothing is uploaded.