In this essay
  1. I did not improvise
  2. Ambiguity is a system problem
  3. The three mistakes
  4. What a good escalation contains
  5. Three levels
  6. The escalation matrix for the shift

“There's a problem. What should I do?”

This is the most common escalation and the least useful one. It does not say what happened, what has been done or what decision is needed. It moves the problem one level up, together with every question the person could have cleared up themselves.

The opposite is a problem too. Someone who never takes anything higher can look very independent, right up to the moment they are holding a problem that crossed the limit of their role a long time ago.

Between these two extremes sits one of the most important questions for an operation that has to run without the manager close by: when do you solve it yourself, and when do you take it higher?

In Leadership without a title I wrote that initiative and authority are two different things. Here I want to turn that difference from a personal feeling into a clear rule.

I met the question in two jobs. At night in the hotel, every problem began with the same sorting: could I solve it within my role, did it belong to the responsible department, or did it need a decision higher up? In the cases I had, technical problems in rooms went to Maintenance; housekeeping matters went to that department, and into the handover for follow-up. In last mile, the Team Leader worked very close to the daily operation: loading, the dock, drivers, absences, delays, problems as they happened. Rules said when the Team Leader had to be informed, for example when a bag was missing during loading, and damage and the cold chain had clear standards and checks.

I did not improvise

From training onwards I worked by one principle. The checklist showed what had to be done. The documents showed how to do it. But when the two contradicted each other, or something fell outside the standard, I did not improvise. I had it confirmed, or I escalated it. I have no single moment of it on record.

That may look like a lack of initiative. Initiative makes sense within the limit you know. Beyond it, improvising is not courage. It is a risk you take on without the authority to carry it.

Ambiguity is a system problem

If two people in the same role would make two completely different decisions about the same situation, the fault may lie less with the people than with an escalation line that was never drawn well.

That is why escalation should not depend on temperament. One person is more careful and calls about everything; another is more self-assured and calls about nothing. If the system does not say where the line is, the result depends on who happened to be on shift that night.

And an operation that depends on who was on shift is not yet an operation that runs without you.

The three mistakes

In my view, escalation goes wrong in three ways.

The first: everything gets escalated. The person never learns to take ownership. Every deviation becomes the boss's problem, and the boss becomes the point where the whole operation stalls.

The second: nothing gets escalated. This is the most dangerous. The person may keep a problem inside their role even after it has crossed the limit of their authority, the risk they can carry or their competence. When it finally surfaces, it is usually bigger, and later.

The third: escalation without information. This one seems very common to me. The problem moves one level up without getting any closer to a solution. Whoever receives it has to ask ten questions to learn the basic facts, and the time lost there is often the time the decision needed.

Ownership does not mean always solving it yourself. It means taking the problem to where the right decision can be made, with the right information.

What a good escalation contains

A good escalation should deliver five things, and deliver them fast:

  1. What happened.
  2. What impact it has now.
  3. What has been done so far.
  4. What decision is needed.
  5. How urgent it is.

When someone escalates something to me, I want to understand the situation without asking ten questions. The rule I would use is this:

Escalate the decision, not the ambiguity you could have cleared up yourself.

The rule has a limit. If you have five minutes to check the facts without increasing the risk, check them. If the risk is immediate, escalate straight away with what you know. A complete escalation that comes late is worse than a short one that comes in time.

Three levels

This is how I would draw the line today. I would not say “never” about small problems, because the context can change even a small one, but this is how I would divide them.

Solve it yourself when it is within your role, the standard is clear, the risk is low and the decision can be reversed.

Solve it and inform when you can solve it within your authority but the situation matters for the next shift, for a KPI or for the customer, or may happen again. The handover is the natural place to inform.

Do not touch it, escalate it when it involves safety, security, compliance or sensitive data; when there are payments beyond your authority, serious disciplinary decisions or a large financial risk; or in any situation where the decision clearly goes beyond the responsibility of the role.

In last mile, as I see it today, the Team Leader should have room to solve an operational problem within the standard. The moment the problem affects safety or compliance, affects the customer seriously, or needs a decision beyond their authority, it becomes a matter for escalation.

Three levels, five questions

  1. 01Solve it yourselfWithin your role, the standard is clear, the risk is low, the decision can be reversed.
  2. 02Solve it and informWithin your authority, but it matters for the next shift, a KPI, the customer, or may happen again.
  3. 03Do not touch it, escalate itSafety, security, compliance, sensitive data, payments or decisions beyond the role.
  1. 1Is it within my authority?
  2. 2Is there a safety or compliance risk?
  3. 3Can the decision be reversed?
  4. 4Does it affect someone outside my shift?
  5. 5What happens if I wait?
  • 1 is no, or 2 is yes
  • Not reversible, or someone outside the shift
  • All the answers are calm
  • Question 5 sets the speed: if waiting raises the risk, escalate now with what you know.
The matrix does not replace judgement. It gives judgement the same questions, whoever is on shift.

The escalation matrix for the shift

The three levels are the columns. Five questions decide which column a situation belongs in:

  1. Is it within my authority?
  2. Is there a safety or compliance risk?
  3. Can the decision be reversed?
  4. Does it affect someone outside my shift?
  5. What happens if I wait?

Reading the answers:

  • If the answer to question 1 is “no”, or to question 2 is “yes”: do not touch it, escalate it.
  • If the decision cannot be reversed, do not take it alone: at least solve it and inform, and if there is risk, escalate it.
  • If it affects someone outside your shift but is within your authority: solve it and inform.
  • If no answer raises a flag: solve it yourself.
  • The fifth question sets the speed: if waiting increases the risk, escalate straight away with what you know.

When you do escalate, bring the five things of a good escalation.

The matrix leaves the judgement with the person on shift. What it adds is the same five questions, whoever that person is, so that escalation stops depending on temperament. Where two colleagues would still answer them differently, the line itself is probably what needs taking higher.

The escalation matrix for the shift

0/5

If 1 is “no” or 2 is “yes”: do not touch it, escalate it. If it cannot be reversed or affects someone outside your shift: solve it and inform. If no answer raises a flag: solve it yourself. The fifth question sets the speed.

Did you try it?

If you took something from this essay into your shift, tell me what happened. The answers that help others are published under the essay, anonymised.