You do not need a Black Belt certificate to ask good questions.
But knowing the name of a method is not enough to claim you have applied it.
This essay sits between those two sentences.
DMAIC is the Six Sigma cycle for improving a process: Define, Measure, Analyze, Improve, Control. Define the problem, measure it, analyse the causes, improve, and check that the improvement holds. In books it looks like a big project, with a team, a deadline and someone wearing a coloured belt.
What I have and what I do not
Six Sigma, Pareto and 5 Why are methods I know and have made part of how I think about management. Where exactly I learned them, on a course, at university or on my own, I do not know. And I do not have a confirmed certificate, not Yellow, Green or Black Belt.
I also do not have a concrete project where I applied and documented all five phases of DMAIC. I will not claim to have led a formal Six Sigma project without proof.
Even for Pareto and 5 Why, I do not have a confirmed case where I can show that I applied them myself from start to finish. In Pareto and 5 Why in practice I wrote about a 5 Why with only two documented “whys”, and why I did not fill in the rest.
What I do have is experience with real operational problems in last mile: Damage, Incomplete, Delay and Loading Time.
The five phases, as I actually had them
If I set that experience against DMAIC, without dressing it up, it looks like this:
Define. We worked with problems defined through the KPIs.
Measure. We followed the operational results, the targets and the deviations.
Anal
Improve. For concrete measures I put in place myself, and their results, I do not know precisely.
Control. For a documented system of control after improvements, I do not know.
This list tells me something. The first three phases are the ones an operation almost does by itself, because the report demands them every day: there is a problem, there is a number, there is a question “why”. The last two phases are the ones that need someone to hold them. And they are exactly the ones I have the least proof for.
The discipline not t o jump
For me, the value of DMAIC is not in the name, nor in the certificate.
The value of DMAIC lies in the discipline not
First understand the problem. Then measure, analyse the causes, try the improvement and check whether it keeps working.
In operations, the temptation is always the jump. The KPI comes out bad, and someone has a solution straight away. In A bad day or a problem? I wrote about the risk of changing the rules after every fluctuation. DMAIC is the structured way to avoid that: between the problem and the solution there are three steps, and none of them is skipped.
Control, the hardest phase
Today I would single out Control, keeping the improvement. I present this as my view as a manager, not as the conclusion of a formal project I led.
A problem can be solved for a while. But if the standard is not documented, people are not trained and the result is not checked, there is a risk that the problem comes back.
That is why this series is called “Improvement that holds”. The improvement has to continue even when the manager who started it is no longer there. If it only holds as long as that person is there, it was not an improvement of the process. It was one person's presence.
A problem is not solved just because it did not happen again
For the shif t manager
I would tell a shift manager that they do not need to be a Black Belt to start thinking systematically. They can start with five questions, one for each phase:
- What is the concr
e te problem? - How do we measure it?
- What is causing it?
- What can we change?
- How will we check that the improvement lasts?
There is no need to turn every problem on the shift into a complex project. But they should avoid changing procedures just because a KPI came out bad.
You can fill in the sheet below here for a single problem and copy it. If you want to see what the whole cycle looks like on a complete case, Six Sigma in the Warehouse follows a teaching case step by step. It is an example to learn from, not a story from my work.
Five questions do not make you a black belt. But they stop you jumping from the problem to the solution. And on an ordinary shift, that is half the work.
DMAIC in five questions
0/5A guide to how I would do it today. It is not a formal Six Sigma project I have led.