Asking good questions does not take a Black Belt certificate. Claiming to have applied a method takes more than knowing its name.

This essay sits between those two sentences.

DMAIC is the Six Sigma cycle for improving a process: Define, Measure, Analyze, Improve, Control. You define the problem, measure it, analyse the causes, improve, and check that the improvement holds. In books it looks like a big project, with a team, a deadline and someone wearing a coloured belt.

What I bring to it is experience with real operational problems in last mile: Damage, Incomplete, Delay and Loading Time. Six Sigma, Pareto and 5 Why are methods I know and have made part of how I think about management, though I have no complete Pareto or 5 Why of my own to show. I hold no confirmed certificate, Yellow, Green or Black Belt, and no documented project that went through all five phases of DMAIC. In Pareto and 5 Why in practice I wrote about a 5 Why with only two documented “whys”, and why I did not fill in the rest.

The five phases, as I actually had them

Set against DMAIC, without dressing it up, that experience looks like this:

Define. We worked with problems defined through the KPIs.

Measure. We followed the operational results, the targets and the deviations.

Analyze. We looked into the reasons for delays, missing bags and problems with how loads were organised.

Improve. Which measures I put in place myself, and what they achieved, I cannot say precisely.

Control. Whether there was a documented system of control after an improvement, I do not know.

The list is revealing. The first three phases are the ones an operation almost does by itself, because the report demands them every day: there is a problem, there is a number, there is a “why”. The last two need someone to hold them, and they are the ones I have the least proof for.

DMAIC: five phases, one discipline

  1. 01DefineOne problem, one place, one period
  2. 02MeasureWhich number, from where, and what it was before
  3. 03AnalyseThe cause you tested, not the first that came to mind
  4. 04ImproveA change you can try
  5. 05ControlWho follows it, how often, what if it comes back

A problem is not solved just because it did not happen again today: Control sends you back to the number.

The value of DMAIC lies in the discipline not to jump straight from the problem to the solution.

The discipline not to jump

The value of DMAIC lies in the discipline not to jump straight from the problem to the solution.

Neither the name nor a certificate gives you that. You first understand the problem, then measure it, analyse the causes, try the improvement and check whether it keeps working.

In operations, the temptation is always the jump. The KPI comes out bad, and someone has a solution straight away. In A bad day or a problem? I wrote about the risk of changing the rules after every fluctuation. DMAIC is the structured way to avoid it: between the problem and the solution lie three steps, and you skip none of them.

Control, the hardest phase

Of the five phases, today I would single out Control: keeping the improvement.

A problem can be solved for a while. But if the standard is not documented, people are not trained and nobody checks the result, the problem risks coming back.

That is why this series is called “Improvement that holds”. The improvement has to continue after the manager who started it has gone. If it only holds as long as that person is there, what held was one person's presence.

A problem is not solved just because it did not happen again today.

For the shift manager

I would tell a shift manager that they do not need to be a Black Belt to start thinking systematically. Five questions are enough to begin with, one for each phase:

  1. What is the concrete problem?
  2. How do we measure it?
  3. What is causing it?
  4. What can we change?
  5. How will we check that the improvement lasts?

Not every problem on the shift has to become a complex project. But they should avoid changing procedures just because a KPI came out bad.

You can fill in the sheet below for a single problem and copy it. If you want to see the whole cycle on a complete case, Six Sigma in the Warehouse follows a teaching case step by step. It is a teaching example and does not come from my work.

Five questions are enough to stop the jump from the problem to the solution, and on an ordinary shift that is half the work.

DMAIC in five questions

0/5

How I would do it today.

Did you try it?

If you took something from this essay into your shift, tell me what happened. The answers that help others are published under the essay, anonymised.